The construction of a new bridge along Bolotnaya Embankment, in the bed of the Vodootvodny Canal
The construction of a new bridge along Bolotnaya Embankment, in the bed of the Vodootvodny Canal. The bridge will pass beneath the Maly Kamenny Bridge. Its total length will be about 170 metres






